
Flare gas to methanol and DME
Reforming: tested in pilot. Methanol and DME synthesis: engineering basis
Turn flare gas into methanol or DME
Associated gas that is flared today can be reformed into syngas and converted into a liquid that is easy to store and truck.
The problem
Flaring burns value and draws scrutiny
Where there is no pipeline, associated gas gets flared. That is lost revenue and additional reported emissions, and the volumes are usually too small to justify a conventional gas plant.
The solution
A liquid product that can be shipped
- The gas is knocked out and compressed, then reformed in the HTR skid
- Sour gas goes in with less sweetening required
- The syngas is compressed and converted to methanol, with an optional step to DME
- Purge gas from the loop returns to the reactor as fuel
Less sweetening
Moderate levels of H₂S in the gas do not harm a reactor with no catalyst.
Right-sized
Modular skids for flare volumes too small for a pipeline.
Liquid product
Methanol and DME store and truck like any liquid fuel.
Contaminants
Where the contaminants go
Flare gas to methanol and DME: the HTR skid replaces the conventional reformer in front of a small synthesis loop.
Less sweetening
Associated and flare gas often carry H₂S. Moderate levels do not harm a reactor with no catalyst, so less sweetening is needed before reforming.
Tuned for synthesis
Water addition shifts the syngas toward the hydrogen-to-carbon balance a methanol loop needs. A dehydration step turns methanol into DME.
Purge gas recycled
Purge gas from the synthesis loop goes back to the reactor as fuel instead of to a flare.

Pilot program
Propane and natural gas were run in the 2026 pilot campaign, both on their own and co-fed with wastewater.
Suitability
Operators with flared or stranded associated gas, no pipeline takeaway and a trucking route for a liquid product.
Every case is unique
Every stream is different.
Share a description of the waste stream and RegenSyn Energy will give a first view of whether it fits the HTR and what it could produce. An NDA can be put in place first.
A feasibility study or pilot test is available on request.